Isuzu 15 and 20kWe biogas CHPs

IMG_3725

Gas train

IMG_3722

Water cooled exhaust manifold

IMG_3730

Oil level maintainer valve

IMG_3718

Remote dump radiator

Remote dump radiator

Remote dump radiator

Comap Controller

Comap Controller

Multiple orders

Multiple orders

One coil per cylinder ignition

One coil per cylinder ignition

Isuzu biogas being built 1

Isuzu biogas being built 1

Isuzu biogas being built 2

Isuzu biogas being built 2

Isuzu biogas being built top

Isuzu biogas being built top

Opening top enclosure

Opening top enclosure

Asynchronous generator

Asynchronous generator

Commissioning time

Commissioning time

View from the open top

Top view

Woodward integrated throttle governor
Woodward integrated throttle governor
Water cooled exhaust manifold

Water cooled exhaust manifold

Finishing the build

Finishing the build

View of turbo charger

View of turbo charger

Powered by WordPress. Designed by Woo Themes